The Project

  • Crivitz Elementary School

    1. Create 4-year-old kindergarten and early childhood classrooms with dedicated restrooms and elevator to provide accessibility

    2. Renovate space for a kindergarten classroom with a dedicated restroom

    3. Relocate the library to provide better access for students and the community

    4. Create areas for small-group instruction

    5. Expand 5th and 6th grade classrooms (second and third floors)

    6. Add an elevator to provide accessibility to the lower level

    7. Relocate the school office and secure entry

    8. Reconfigure traffic flow

    9. Resurface parking lots

     

    Additionally, the plan would:

    • Replace windows

    • Replace roofs 

    • Update plumbing

    • Replace interior/exterior doors

    • Update heating/ventilation and electrical systems

    • Address ADA compliance issues 

    • Improve traffic-flow to separate parent and bus drop-off and pick-up

     

  •  

     

    Middle/High School Tech Ed

    1. Update the tech ed (shop) areas to support courses in metals, woods, fabrication, engineering, and automotive/small-engine repair 

    2. Addition to create separate spaces for the metals shop and auto shop 

    3. Provide a fab lab / classroom space for tech ed  

    4. Renovate and expand the maintenance / receiving area

     

  • *floor plan cropped to showcase addition and renovation project